Αηδόνια (Τμήμα Γ)

Building 03

Same dumping system of the building 01, with a unique bigger volume in this case. On the north façade it’s located a spring accessible from that which is the main common area of the settlement, and therefore accessible from all the population. At the other side posterior additions of minor height link with the body of the building, which are now used as stall (unique part of the area still utilized) and presents a reinforced concrete replacement. Currently a door which might be connecting the volumes is stop up with a layer of masonry thinner than the bearing structure; an internal wall which was bearing the original roof conserves a hut shape at the sides, underlining that it was erected later than the perimetral ones.